淀粉廢水處理工程實(shí)例
一 工程概況
攀枝花某公司主要生產(chǎn)玉米淀粉等產(chǎn)品,年產(chǎn)玉米淀粉20萬噸,排放廢水1000~1500m3/d。為了保護(hù)環(huán)境,防止廢水對(duì)周圍水體造成污染,該公司充分利用淀粉廠原有部分儲(chǔ)罐,建設(shè)了一套處理能力為1500m3/d的廢水處理設(shè)施。
二 處理工藝
1 生產(chǎn)工藝及水質(zhì)
淀粉廢水主要來源于玉米淀粉加工過程中的洗滌、壓濾、濃縮等工藝段,用水量由于生產(chǎn)設(shè)備和生產(chǎn)工藝的不同,約為2~8m3水/t淀粉。根據(jù)該淀粉廠水質(zhì)監(jiān)測(cè)結(jié)果,同時(shí)參照國內(nèi)部分相類似淀粉廠的排水水質(zhì)實(shí)際情況,綜合考慮各種因素,確定廢水處理站的設(shè)計(jì)進(jìn)水水質(zhì)。
根據(jù)該市城市排水總體規(guī)劃要求,淀粉廠處理出水排入城鎮(zhèn)排水系統(tǒng),由城市污水處理廠集中處理達(dá)標(biāo)排放,故本工程排放執(zhí)行《污水綜合排放標(biāo)準(zhǔn)》(GB8978-1996)三級(jí)標(biāo)準(zhǔn)。
2 處理工藝
本工程采用厭氧EGSB+好氧A/O處理工藝。廠區(qū)廢水經(jīng)過格柵初步分離去除粗大雜物后進(jìn)入集水井, 經(jīng)泵提升后進(jìn)入初沉池進(jìn)一步去除較小的SS顆粒物及大部分淀粉;初沉池出水自流進(jìn)入調(diào)節(jié)池進(jìn)行水量水質(zhì)均衡調(diào)節(jié);調(diào)節(jié)池出水自流進(jìn)入到EGSB進(jìn)水池,在進(jìn)水池內(nèi)進(jìn)行溫度調(diào)節(jié)、酸堿度調(diào)節(jié)后由提升泵打入?yún)捬?/span>EGSB反應(yīng)池,在厭氧池內(nèi)大部分有機(jī)物得以降解去除;厭氧池出水自流入后續(xù)A/O反應(yīng)池進(jìn)行好氧處理,好氧出水沉淀后達(dá)標(biāo)排放。
厭氧池產(chǎn)生的剩余污泥可以單儲(chǔ)存或者和好氧池的剩余污泥一起排入集泥池,經(jīng)濃縮脫水機(jī)濃縮脫水后,泥餅外運(yùn)填埋。
三 技術(shù)經(jīng)濟(jì)指標(biāo)
該淀粉廠廢水處理工程投資715萬元,勞動(dòng)定員9元,運(yùn)行功率為140Kw。藥費(fèi)0.45元/m3,年運(yùn)行費(fèi)32萬元,噸水處理費(fèi)1.818元。
四 工程評(píng)析
本工程淀粉廢水的BOD/COD值大于0.4,可生化性很好,因此采用生物處理工藝是合適的,以在盡量低的費(fèi)用下,可靠地將有機(jī)污染物降到所要求的水平。厭氧工藝采用了高負(fù)荷的EGSB工藝,占地面積小,投資省。從運(yùn)行結(jié)果來看,該工藝運(yùn)行可靠,出水穩(wěn)定達(dá)標(biāo)。
濟(jì)寧天通設(shè)備公司是國內(nèi)的水處理設(shè)備研發(fā)、生產(chǎn)制造銷售與一體的生產(chǎn)廠家,其核心產(chǎn)品以:污水處理設(shè)備、廢水處理設(shè)備、工業(yè)廢水設(shè)備、生活污水處理設(shè)備、食品廠污水處理設(shè)備、屠宰場(chǎng)廠廢水處理設(shè)備、醫(yī)院廢水處理、制藥廠廢水設(shè)備等水處理設(shè)備為主;
濟(jì)寧 天通,始終堅(jiān)持以“先做人,后做事”為核心價(jià)值觀,以“儒商文化”為品牌文化,以“做今日品牌,創(chuàng)企業(yè)”為宗旨,以“實(shí)用為本、德行天下”為理念,鑄造中國機(jī)械行業(yè)的品牌。公司依托與國外的分支機(jī)構(gòu)、國內(nèi)的辦事處、及的施工隊(duì)伍,憑借行業(yè)內(nèi)設(shè)備研發(fā)團(tuán)隊(duì)的強(qiáng)大創(chuàng)新能力、扎實(shí)的設(shè)備品質(zhì)、完善的售后服務(wù)體系,贏得了全球客戶的信任與合作。
An example of starch wastewater treatment
Project overview
Panzhihua company mainly produces corn starch and other products, producing 200,000 tons of corn starch and discharging waste water of 1000~1500m cubed/d. In order to protect the environment and prevent the waste water from polluting the surrounding water, the company made full use of the original storage tank of the powder factory and built a waste water treatment facility with capacity of 1500m cubed/d.
Two-process process
1 production process and water quality
Starch wastewater mainly comes from the process of washing, pressure filtration and concentration of corn starch. The water consumption is about 2~8m cubic water/t starch due to different production equipment and production process. According to the monitoring results of water quality starch factory at the same time with reference to domestic similar part of starch factory drainage water quality situation, comprehensive consideration of various factors, can design the water quality of waste water treatment station.
In accordance with the requirements of the city's urban drainage planning, starch factory processing out of the water into the urban drainage system, the standard for central treatment of urban sewage treatment plant emissions, emissions of this project execution "integrated wastewater discharge standard" (GB8978-1996) level 3 standards.
2 treatment process
This project adopts anaerobic EGSB+ aerobic A/O treatment process. After the initial separation and removal of coarse and large debris from the factory, the waste water was removed into the collecting well. After the pump hoisting, the small and small SS particles and most of the starch were further removed. The water quality is regulated by water flow into the regulating pool. Basin artesian water into the EGSB into the pool, conducted in into the pool temperature adjustment, ph adjustment after the lift pump into the anaerobic EGSB reaction pool, in most of the organic matter degradation to remove inside YanYangChi; The water from the anaerobic pool is discharged from the following A/O reaction pool for aerobic treatment, and good oxygen discharge is discharged after the precipitation.
The residual sludge produced by the anaerobic pool can be stored separately or together with the remaining sludge of the oxygen pool. After the concentrated dehydrator is concentrated and dehydrated, the mud cake is filled and buried.
Main design parameters
(1) grid and collecting well grated Wells and collecting Wells are new steel mix structures. In the water inlet channel, the grille well is set and the mechanical grille is installed. Grid structure dimensions 4.0m x 0.8m x 4.0 m. The structure size of the collecting well is 2.5m x 2.5m by 5.0 m. Mechanical grid, a grid 700 mm wide, grating Angle of 60 ℃, power 2.2 KW. Equipped with spiral conveyor 1, diameter 260mm, power 2.2 KW. Lift pump discharge 110m cubed/h, lift 13.0 m, power 7.5 kW, 2 (1 for 1).
(2) at the beginning of the water pond, the vertical sedimentation basin, geometry size: 9.0 m * 8.0 m ?, the effective depth of 7.5 m. Inside and diversion tube 1 set of specifications ? 0.70 m by 3.5 m.
? (3) regulating pool size 9.0 m * 8.0 m, and the effective depth of 7.25 m, adjust pool number for 3, residence time of 22 h, of which two pool for the accident.
(4) the effect of EGSB into the pool is mainly to adjust the temperature and pH of the water in the EGSB reaction pool, as well as the circulating reflux pool of the EGSB reaction tank. Steel mixing structure, size 3.0m x 3.0m x 7.4 m, effective water depth 6.9 m. Vertical mixer 1, power 3.0 kW; Hydraulic curved sieve 1 set, dimensions 1.5m x 1.2 m, gap 0.50 mm.
(5) EGSB reaction pool EGSB adopts special equipment, steel structure, carbon steel corrosion and 1 tank. Design of water after 2500 m/d, volume load 5.3 KgCOD/(m after · d), structure size ? 7.64 m * 18.0 m, 802 m after reactor volume, effective height of 17.5 m, hydraulic retention time of 12.5 h.
(6) EGSB mud pools of steel structure, such as one dimension ? 5.0 m * 6.3 m, the effective depth of 4.3 m.
(7) EGSB biogas ambry of steel structure, such as one dimension ? 5.0 m * 6.3 m, the effective depth of 5.8 m.
(8) A/O reaction pool set 2 pools, with 4 g, and the front end of the hypoxia section. 2 hypoxia pool, size 16.6m x 2.0m x 4.9 m, total effective volume 325m cubed; 2 aerobic pools, size 15.0m x 16.0m x 4.9 m, total effective volume 2352m cubed; Effective depth of 4.9 m. 2 internal reflux pump, flow 30m cubed/h, lift 5m, power 1.5kw. 2 underwater agitator, power 1.5kw. The aerator was used with polymer tube aerator, and the aeration number was 400.
(9) double sink vertical flow, reinforced concrete structure, and A/O pool. 2 pools, with a structural size of 6.5m x 6.5m x 5.85 m. 2 sets of diversion tube, specifications ? 1.50 m by 4.4 m. Water weir 51.2m,250m x 700(h) mm.
(10) anaerobic sludge concentration pool anaerobic-aerobic sludge production quantity every day a total of 670 kg/d, or 99.4% of moisture content of sludge is 112 m after a/d, the sludge concentration pool treatment sludge, aerobic sludge and anaerobic sludge can be regularly into sludge thickener, after concentrated tank into the dewatering machine. ? structure size 5.0 m * 5.8 m, the effective depth of 6.3 m.
(11) sludge dehydration to reduce the water content of sludge, 1. 500mm of sludge dewatering machine to dehydrate the concentrated pool sludge.
(12) EGSB upgrade pump room structure size 4.50m x 6.0 m, with a net height of 4.15m. 2 EGSB inlet lift pump, flow 65m cubed/h, lift 25m, power 7.5 kW. 2 EGSB reflux pump, flow 25m cubed/h, yangcheng 30m, power 4.0KW.
(13) the structure size of the blower room of the integrated machine pump is 8.5x4.3m, the net height is 3.75m, the wall of the blower room is laid with the absorbing material, the Windows are double-glazing, and the indoor axial flow fan is installed. 3 sets (2 with 1 backup) roots blower, flow rate 50.0m cubed/min, outlet pressure 6m, motor power 45kW. 2 (1 for 1) residual and return sludge pump, flow 40.0m cubed/h, lift of 7.m, power 2.2kw. 1 set of pH plus drug system, power 1.0kw.
Technical and economic indicators
The waste water treatment project of the factory is RMB 7.15 million, the labor is 9 yuan, and the operating power is 140Kw. The drug charge is 0.45 yuan/m to the third, the annual transportation fee is 320,000 yuan, and the water treatment fee is 1.818 yuan.
Four project evaluation
Starch wastewater BOD/COD value of this project is greater than 0.4, the biological sex is very good, so the biological treatment process is appropriate, to ensure that as far as possible in the low cost, reliable to the required level of organic pollutants. Anaerobic process USES high - load EGSB process, small area, investment province. From the results of operation, the process is reliable and the water discharge is stable.
Jining day pass equipment company is a leading domestic water treatment equipment research and development, manufacturing sales and one of the manufacturers, its core product: sewage treatment equipment, wastewater treatment, industrial wastewater treatment equipment, sewage treatment equipment, sewage treatment equipment, slaughterhouse wastewater treatment equipment in food, pharmaceutical wastewater, hospital wastewater treatment equipment, water treatment equipment is given priority to;
Jining day pass, always adhere to the "oneself first, after doing things" as the core values and brand culture of "intellectual businessman culture", to "do today's brand, set up one hundred enterprise" for the purpose, to "practical, virtue" for the idea, brand casting machinery industry in China in one hundred. Companies rely on with foreign branches, domestic offices, and professional construction team, with industry equipment research and development team of experts strong innovation ability, solid equipment quality and perfect after-sales service system, won the trust and cooperation of global customers.